[wxsig] T238+assy.pdf
Will Beals will at beals5.comTue Feb 28 05:24:22 UTC 2006
- Previous message: [wxsig] T238+assy.pdf
- Next message: [wxsig] Hurricane Season Preparation
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
John: 1) For missing parts, contact the TAPR office. 2) George (earlier) noticed this too, in all the beta testing and units I had assembled with both the T238 and T238+ I had never noticed those bumps before, so while you are clearly correct they came as a very recent surprize! Intstall the pot the only way it fits and ignore the silkscreen. 3) SW1 is tricky. The hole you are referring to is the depression I'm referring to, make sure that is pointing toward the potentiometer. 4) The assembly diagram for the regulator noted in the regulator section and refers you to page 11. Hope this helps. If not, please ask here. On the BP sensor. The one I developed with appears no longer available. I'm being asked to support the AAG one. I expect I will, just not sure when. will -----Original Message----- From: wxsig-bounces at lists.tapr.org [mailto:wxsig-bounces at lists.tapr.org] On Behalf Of wj0d Sent: Monday, February 27, 2006 8:59 PM To: 'TAPR Weather Station SIG Mailing List' Subject: [wxsig] T238+assy.pdf Hi Will, I have basically put my T238+ together. A couple of questions and suggestions. 1. How to I get a missing part. One of the Ferrite Beads was missing so I have left off L5 for now. 2. Not sure on placement of the pot. It doesn't match the silkscreen diagram. On page 5 of the .pdf, it says to align the trim pot according to the silkscreen. The silkscreen shows the pot with the two little tabs away from the edge of the board and down toward the middle. If you put it in the 3 holes the tabs are the other way around so the two tabs are up toward the edge instead. Obviously it won't fit following the outline on the silkscreen. 3. Installing the switches, SW1 doesn't have a depression but actually a hole in the one side of the plunger and the other 3 sides are solid so I took that as a depression and placed it up. 4. In installing the voltage Regulator, there is no comment on bolting it to the circuit board and what or where the bold is to hold it to the board. The bolt is in the screw/spacer package if it is to be the sliver like about a Nr. 8 or maybe Nr. 6 bolt and nut. Neither side of the diagram shows a lock washer which is affixed to the head of the only bolt that would fill the bill to hold the sink and regulator hard to the circuit board. Any suggestions on the ferrite bead and am I off base on the instructions? Regards and 73, John wj0d _______________________________________________ wxsig mailing list wxsig at lists.tapr.org https://lists.tapr.org/cgi-bin/mailman/listinfo/wxsig
- Previous message: [wxsig] T238+assy.pdf
- Next message: [wxsig] Hurricane Season Preparation
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
More information about the wxsig mailing list
